FOOTING TRENCH TREATMENT
The walls and bottom of the footing trench must be treated with our chemical as part of the pre-construction treatment for white ants. The external wall's footing is subsequently created by pouring concrete into the trench.
EXTERIOR TRENCH TREATMENT
After the building's external walls are in place, a trench around the entire structure is dug that is deep enough to reveal the footing. This trench has received extensive care. The dirt being replaced is saturated with the solution as it is being filled. Preconstruction care can be scheduled to coincide with your construction timetable. With particular attention to cooperation with your construction job. Construction can continue without even the smallest pause to achieve termite control.
PAD TREATMENT
After the footing has been poured and exterior walls started all of the exposed soil that will be under the slab of building is thoroughly drenched with the chemical.